Our medical device client was feeling the pain of packaging bottlenecks, space constraints, and continuity of supply problems.
Supply Chain Surgery
WIC SOLUTION:
- Reformatted their warehouse
- Remolded deliveries
- Optimized bulk containers
- Redesigned overpacks

THE RESULTS:
18%
Overpack Cost
75%
Packaging Space
50%
On-Hand Inventory
25%
Freight Expenses
Built for the Swing: Protecting Shipments Through Temperature Changes
Summer heat gets the attention, but fall may be harder on your shipments. Why? Because…


